• Automatic Chain Conveyor System for Precast Concrete Spun Pile Mould Tangchen
  • Automatic Chain Conveyor System for Precast Concrete Spun Pile Mould Tangchen
  • Automatic Chain Conveyor System for Precast Concrete Spun Pile Mould Tangchen
  • Automatic Chain Conveyor System for Precast Concrete Spun Pile Mould Tangchen
  • Automatic Chain Conveyor System for Precast Concrete Spun Pile Mould Tangchen
  • Automatic Chain Conveyor System for Precast Concrete Spun Pile Mould Tangchen

Automatic Chain Conveyor System for Precast Concrete Spun Pile Mould Tangchen

After-sales Service: Negotiation
Warranty: Negotiation
Type: Concrete Mixing Plant
Machining Process: Hydraulic
Structure: Cylinder Type
Certification: ISO9001: 2000, CE
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
Tangchen
Condition
New
Color
Original
Technological Advantage
Our Engineer Is Highly Educated and Experienced
Power
380V/50Hz Three-Phase Power Supply
Trade Terms
Ex Works/Fob/CIF
Delivery Time
45 Working Days
Services Provided
Personnel Dispatch
Transport Package
Sea Worthy Packing. Special Packing Is Negotiable
Trademark
Tangchen
Origin
China
HS Code
848060
Production Capacity
100 Set/Month

Product Description

Supply Ability
Supply Ability
200 Meter/Meters per Month custom made as per customers' requirements
Packaging & Delivery
Packaging Details:
As per the standard export packing, sea worthy packing. Special packing is negotiable under customer's requests.
Port:Shanghai Port or Other
Lead Time:Within 60 Days


Production Description

I. Selection Description

1.   This machine is used to transfer upper mold transversely. 

2.   Control System: Electrical part needs to be connected to the power of 380V/50Hz.

II. Structure and Specifications

1. Structure: End base and driving mechanism, rack and chains.

2. Specifications: Technical Parameters

(1)Machine Length:      16.075m

(2)Center Distance:      15.375m

(3)Conveying Speed:    13 m/min

(4)Power:                    5.5kw

III. Precautions

 i.  Initial Installment

1. This set of chain conveyor is made of three chain conveyor and one set of driving mechanism.

2. Different bodies of machine should be in the same height and level during installation.    

3. The center lines of different head wheels should be in the same straight line.

4. Fix the base on the pre-buried steel plate in the foundation after adjustment.

  ii.  No-load Operation

1. Check the chains before starting; sweep out sundries and fill lubricating oil on the chains.

2.  Start driving motor and check if the chains operate smoothly without any jamming.

3. As the chains are in run-in period, load tests are needed after few hours' initial operation.

 iii. On-load Operation

1. Hanging the upper mold right above the chain conveyor; transferring wheels for pipe mold should be in the central part of the cart; start driving motor and the chain conveyor will transfer pipe mold to designated place; after the photoelectric switch detects pipe mold has been in the designated place the chain conveyor will stop transferring.

iv. Precautions when hanging pipe mold

1. When putting upper mold to the chain conveyor from the overhead crane, only professional staff can conduct this operation. Untrained staff shall not conduct this operation.

2. When hanging pipe mold with cages from carts, make sure the pipe mold is tightly grabbed before the overhead crane slowly moving.

Automatic Chain Conveyor System for Precast Concrete Spun Pile Mould TangchenAutomatic Chain Conveyor System for Precast Concrete Spun Pile Mould TangchenAutomatic Chain Conveyor System for Precast Concrete Spun Pile Mould TangchenAutomatic Chain Conveyor System for Precast Concrete Spun Pile Mould Tangchen


Automatic Chain Conveyor System for Precast Concrete Spun Pile Mould TangchenAutomatic Chain Conveyor System for Precast Concrete Spun Pile Mould TangchenAutomatic Chain Conveyor System for Precast Concrete Spun Pile Mould TangchenAutomatic Chain Conveyor System for Precast Concrete Spun Pile Mould TangchenAutomatic Chain Conveyor System for Precast Concrete Spun Pile Mould TangchenAutomatic Chain Conveyor System for Precast Concrete Spun Pile Mould TangchenAutomatic Chain Conveyor System for Precast Concrete Spun Pile Mould Tangchen
FAQ
Automatic Chain Conveyor System for Precast Concrete Spun Pile Mould Tangchen

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2021

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
306
Year of Establishment
2011-01-05